CENTRAL TEXAS WSC
200,000 GALLON WATER STORAGE STANDPIPE
KILLEEN, TX
In 2008, S. D. Kallman, L.P. designed this 50 foot high welded steel standpipe for Central Texas WSC. This $200,000. Tank on Chaparral Road near State Hwy. 195 stores water that is pumped from Central Texas WSC’s original 14.35 MGD water treatment plant on Lakecliff Drive.
[portfolio_slideshow]